25t Lead Hot Chamber Jig Diecast Machine lead alloy die casting fishing sinker Making Machine
| Clamping Force: | 250 KN | Tie Bar Diameter: | 45 Mm |
| Clamping Stroke: | 135 Mm | Space between Tie Bars(H*V): | 233*276 Mm |
| Mold Thickness: | 130-220 Mm | Injection Force: | 25 KN |
| Injection Plunger Stroke: | 70 Mm | Plunger Diameter: | 38/42 Mm |
| Theoretical Shot Volume: | 200 G | Usable Shot Volume: | 150 G |
| Warranty: | 1 Year |
![]() |
![]() |
Reduce your factory’s energy and utility costs with our energy-optimized 25-ton hot chamber die casting machine, purpose-built for efficient lead sinker and fishing weight manufacturing. It delivers industry-leading output while minimizing power and cooling water consumption, lowering your monthly operational expenses.
This energy-efficient 25T machine achieves over 10 cycles per minute, delivering 40% higher output than older, less efficient models while using less power per cycle. Its optimized hydraulic system reduces idle power consumption, cutting overall energy use per finished part.
- Optimized hydraulic system reduces idle power consumption, cutting overall energy use per finished part.
- Efficient cooling design reduces water consumption compared to standard casting machines, lowering utility bills.
The machine’s exclusive anti-scale cooling design improves cooling efficiency and eliminates wasted water from clogged systems, especially in hard water regions. Its optimized oil cooling system maintains stable temperatures with lower energy input, reducing overall power consumption while supporting a 10–15 year service life.
- Integrated oil cooling system maintains steady hydraulic temperature during prolonged continuous operation, reduces wear on core components and extends overall service life.
- Scale-free cooling operation maintains consistent efficiency over time, no rising utility costs from clogged cooling lines.
Optional add-ons including high-efficiency auxiliary cooling can further improve energy and water efficiency for your production line:
- High-efficiency supplementary cooling unit for enhanced temperature control with lower water consumption
- Energy-saving hydraulic system upgrade for even lower power usage during extended runs
We prioritize getting your energy-efficient production line operational as quickly as possible, with end-to-end support from order placement through the full equipment lifecycle.
- 10-day express delivery for standard configurations, cutting lead times to get you into full production faster
- 2-hour initial response + 24-hour full resolution after-sales support for all technical issues
- 1-on-1 dedicated account manager service throughout your order and equipment service life
- On-site engineer service available for installation, efficiency optimization, operator training and scheduled maintenance
- Factory visits are warmly welcomed to inspect equipment and discuss your fishing tackle production needs in person


